summaryrefslogtreecommitdiff
path: root/doc
diff options
context:
space:
mode:
authorTom Rini <trini@konsulko.com>2022-07-12 17:34:15 -0400
committerTom Rini <trini@konsulko.com>2022-07-14 14:14:29 -0400
commit105bccb3b9404868bea41f2378902064b2646e4e (patch)
tree5625ce4264729f483b846cf19eb02627f80c36d4 /doc
parent6b484ba69f7024b794f68ff917936aead3d74f98 (diff)
doc: process: Correct and expand slightly on the Merge Window concept
For quite a long time we've been using a 3 week, rather than 2 week, merge window as it was only 2 weeks during the timeframe where we did 2 month rather than 3 month releases. This corrects the places that still had 2 weeks and tries to make things a bit clearer overall. Cc: Heinrich Schuchardt <xypron.glpk@gmx.de> Signed-off-by: Tom Rini <trini@konsulko.com>
Diffstat (limited to 'doc')
-rw-r--r--doc/develop/process.rst11
1 files changed, 6 insertions, 5 deletions
diff --git a/doc/develop/process.rst b/doc/develop/process.rst
index 4ba4bb2d65..0ef24e8199 100644
--- a/doc/develop/process.rst
+++ b/doc/develop/process.rst
@@ -8,8 +8,8 @@ Management Summary
* Development happens in Release Cycles of 3 months.
-* The first 2 weeks are called Merge Window, which is followed by a
- Stabilization Period.
+* The first 3 weeks of the cycle are referred to as the Merge Window, which is
+ followed by a Stabilization Period.
* Patches with new code get only accepted while the Merge Window is open.
@@ -27,7 +27,7 @@ U-Boot development takes place in `Release Cycles
<https://www.denx.de/wiki/U-Boot/ReleaseCycle>`_. A Release Cycle lasts
normally for three months.
-The first two weeks of each Release Cycle are called *Merge Window*.
+The first three weeks of each Release Cycle are called *Merge Window*.
It is followed by a *Stabilization Period*.
@@ -36,8 +36,9 @@ The end of a Release Cycle is marked by the release of a new U-Boot version.
Merge Window
------------
-The Merge Window is the period when new patches get submitted
-(and hopefully accepted) for inclusion into U-Boot mainline.
+The Merge Window is the period when new patches get submitted (and hopefully
+accepted) for inclusion into U-Boot mainline. This period lasts for 21 days (3
+weeks) and ends with the release of ``"-rc1"``.
This is the only time when new code (like support for new processors or new
boards, or other new features or reorganization of code) is accepted.